Sunday, February 9, 2014

Let The Demo Begin....

It has been quite a while since my last update.  With the holidays, cold weather, and crazy amount of extra time at work I have not accomplished as much as I had hoped.  The first big project that I completed was removing the wall between the family room and kitchen.  This wall was not load barring so it was an easy removal.  You can see in the picture below the wall before it came down.



I scored the drywall across the ceiling to cut the drywall tape in order to keep from causing more ceiling damage when the wall came down.  The below picture shows the interior of the wall.  The person that originally framed this apparently did not care about the interior support being square. 



The picture below shows what a difference removing this wall made. It took less than an hour to remove the entire wall. 



I will be raising the ceiling at a later point so I did not worry about patching the drywall.  The far door will also be removed shortly and three large windows will be added to that wall to add more light to the family room.   

I have also been planning for the next big project which will be tearing out the master bathroom.  Currently the master bathroom is separated into two rooms.  I plan to remove the dividing wall and make one large room.  One cool feature I am adding is speakers in the bathroom for my whole home audio system which includes a waterproof speaker to put into the shower.  I am pretty excited to get this all installed.  Below you can see what the bathroom currently looks like.





The below renderings give a little better idea of what the floor plan will look like.  The colors and cabinets are just to fill the spots but will not be what it looks like when it is completed.  I will be using more contemporary sinks and a vanity with more cabinet space.  There will also be a frameless glass door on the shower.  I used Google Sketch-Up for the drawing and it turned out pretty well for my first try.  The entire bathroom will be tiled so it is about time to break out the tile saw! 







Well that is all for now.  Stay tuned for more frequent updates as work picks up again!   

Saturday, December 7, 2013

It Doesn't Even Look Like the Same House.....

It has been almost a month since the last update and my house barely even looks the same.  Last post showed that I had started painting and had started the arbor above the garage door but a lot has changed since then. 

One of the first projects I completed was the arbor over the garage door.  As you can see below it turned out real well.  After trying six different colors of stain, I couldn’t find one that looked real good with my other house colors.  I wound up mixing multiple stains together until I found a color I liked.  I then took that color to my local home depot and had them custom color match a gallon of it since my testing was only a few ounces at a time.  I feel I found the perfect color.  In the last post I had not yet placed the top boards on the arbor.  These boards are all cedar so they will hold up better outside.  In this whole project there was a little over 120 linear board feet of lumber used.  The entire arbor including the stain cost under $250 to build; so I got a lot of bang for my buck! Below is a picture of the completed arbor. 




Another huge change was the new roof was installed.  This picture was from a couple weeks ago since there is snow on my roof right now, but it made a huge difference.  Here is a reminder of before:


And here is after:


The next project that my brother and I completed was adding new shutters to the house.  These are made out of cedar as well and stained the same color as the arbor.  It took about 20 8-foot long boards to make all 10 shutters (8 upstairs 2 downstairs).  Total cost for the shutters with stain was about $120.  As you can see, the shutters really finished off all the other little pieces we were working on.  You can also see that I started the Christmas decorating.


One of the last projects was adding the windows to the garage doors.  Many times you have to order your garage doors from the factory with the windows already installed.  This can cost around $1,500 a door.  Obviously this is out of my price range, and my doors are already new, so I went with a different option.  My brother found this online company: http://addingcurbappeal.com/garage-door-windows.html  The total cost was about $200 for both doors and it made all the difference in the world.  These windows are actually plugs so people cannot look into your garage, which is more secure, and you do not have to cut holes in your garage door.  The windows are made from black acrylic with white vinyl moldings so they will never rot.  They simply screw onto your existing door and my brother and I installed all of them in about 30 minutes.  After having them on my garage, I do not think that I could go without on my next house.  From 5 feet away you wouldn't even know that they are not the real windows. 


So here is an overview picture of what the house looks like now.  Because of the snow and it getting dark it threw the colors off, but it really shows how things are coming together. It is turning out even better than I ever expected.



If you need a reminder, here is what my house used to look like:


Lastly, here is a look at my Christmas decorations.  Anyone that knows or worked with me knows I love Christmas decorations.  Now that I finally have a house I was able to decorate the way I really wanted to all those years I was in an apartment.  The penguins (doubie and doubie dos) and polar bear have made a comeback as they have been with me at every school I have worked at for the last 8 years.  At every place that I have worked I had the scarves on them match the school colors.  Even though I now work in student housing that primarily houses University of Denver students, I don’t really have any allegiance to them (sorry DU readers – I went to UNC and OSU).  So because of this I changed the scarves to brown and tan to match my house.  Now before anyone thinks I spent hours knitting scarves for them (which I have no idea or interest to do) I made them by cutting felt and then hot gluing them together.  It only has to last about 6 weeks and it works. You can see the chains in the picture but that is because I really don't want them stolen.  I anchor them to the ground with 14 inch steel spikes. 


Here you can see them outside after all the decorating is done.


I also put together all the garland and trees for the front of the house.  I added pine cones, lights,  and burlap ribbon to all of it – after all a dude lives here so it really needed to look that way.  You can see my trees in the new pots for the front door below.  The pots are all metal and fit a little better than the old ones I had that were made if wicker.  Those will be re-purposed for the back yard. 



If you know me real well you know that I cannot stand glitter.  To me glitter is the herpes of the craft supply world – once you get it, there is no way of getting rid of it.  So there is no glitter on the outside of the house and the few ornaments I have inside that have glitter on them were encapsulated in a clear coat before it even made it in the front door :)  Well I think that is all and I will leave you with a picture of the house with all the lights on.  On to the next project…..



Sunday, November 10, 2013

Things Are Starting to Come Together.....


My brother and I have made great progress over the last few weeks on my house.  First off, the rock work is done!  This took far longer than I was expecting but it really makes the front of the house.  I had purchased three pallets of stone and only used one of them so the rest will be used on a retaining wall and outdoor fireplace that I will build next summer.  I also have completed the last railing which can be seen in the below picture.  I have done a little more trim painting but still have a couple more coats to go.  I am going from white trim to a dark brown so it takes many coats. I can really only paint when the surface is over 45 degrees so this time of year I can only paint in the afternoons.  I also started painting the downspouts which you can see in the pictures in this post.  Over the next week I will do all the touch-up painting on the front of the house. 
I also recently finished some trim around the windows.  The trim is exterior siding that I cut down and screwed to the side of the house.  After filling the holes, caulking around the edges, and painting it looks real good.  I will add new shutters later.


The bottom of the trim around the windows is not yet completed.  This is because I will be getting a new roof in the next week or so.  The materials are backordered so it had delayed things a couple weeks.  Here is a picture of the shingle I have chosen.  I am pretty excited about it because the roof I have now looks terrible with the new paint color and I have always hated this roof color.  I had to file an insurance claim but basically I am getting a brand new roof for my $1,000 deductible.


The big project I worked on today was relocating my downspouts.  I re-routed the spout on the front gutter to the left side because the old spout didn't work with my new columns.  I did not want the water dumping out next to the foundation like it did before so I re-routed it to dump out on the driveway and flow down to the street.  I have a planter bed where the end of the spout was to be  so I dug into the ground a pipe to have it flow around the corner of the house.  You can see where the pipe is in the ground in the following picture.


I then had the pipe dump out through my stone retaining wall so it is not visible.  It is really only a project that I will ever notice but it turned out cool. 


The other big project has been the start of the arbor above the garage doors.  All of the cross braces have been bolted to the side of the house and are made out of cedar.  The front boards are pine 2x8s.  I have to use pine because cedar can warp as it is not as dense of a wood and with the long spans I need a denser wood like pine.  Everything will be coated in a solid color stain so it will all look the same when it is completed.  I still have all the top braces to add and will hopefully get that completed this week as well.  


Well that is all for now; it will not be long until the blog starts looking at the interior so get ready!

Sunday, October 20, 2013

Big Changes as the Renovation Continues.....

A ton of work has happened on my house over the last few weeks and things are really starting to take shape.  The first project was replacing the garage door.  I had an 8’ wide by 7’ tall door but it is a little too tight for my truck to fit.  My brother and I removed the old door; made the opening a foot wider, removed the angles at the top, and then installed a new door and molding.  I have windows coming next week to put in the garage doors as well. 


In the above picture you can also see that I have removed the vinyl siding by the garage doors and am adding stone to this location as well.  I had to put in a new backer board and add the metal lath but it will really tie the house together all across the front. 

You may have also noticed that the house color is now different.  This weekend my brother and I started to repaint the house.  We found the color on a house in Castle Pines and my brother went up to the owner and asked the colors and they actually had all the color codes so it made it very easy to match.  The picture below is just the start as we still have gutters and accent colors but it will give you an idea of where we are heading.  This house has vinyl siding on it so we had to use a special paint from Sherwin-Williams that can adhere to vinyl but it also reflects heat to keep the vinyl from warping.  We only were able to get the main siding color completed on the front of the house this weekend and will work on the rest over the next few weeks.  Also, you can probably see the roof color does not look that good with the new colors.  I filed an insurance claim a couple weeks ago and they approved it to be replaced due to hail damage so a new roof that matches will be installed in a couple weeks.  I am really excited about it as I really hated this roof color. 



Another project my brother and I have been working on is adding a temporary greenhouse to my backyard.  This greenhouse is actually two greenhouses from Harbor Freight that we modified into one.  We put the greenhouse together so that we can remove it in panels and store it on the side of my house in the summer when it is not needed.  We do have a heater inside the greenhouse to help keep the plants warm but the walls of the greenhouse are a plastic board with an air gap in the center that is great at insulating.  


 I also purchased some LED strip that is waterproof on eBay so that I can see at night. The picture below is taken at night with no flash.  The lights were only $10 and made a huge impact.  We currently have it mostly filled with geraniums but will start our other plants for next year in this greenhouse in a few months. 



We also did a couple other projects but I will save that for a different blog post.  Now that it is getting colder I am planning more inside projects and will be many of the topics of the posts to follow.  That is all for now.  

Thursday, September 26, 2013

A much Needed Update

Well I am finally back for an update.  Anyone that has worked in student housing knows that they pretty much give up their personal lives for most of August and September.  I actually worked 28 days straight between move-outs and move-ins so I did not get a ton done on my house but I did get a couple projects done. 

First off, an update on my master closet.  I finished adding another set of built-in closets and also added a hanging shelf in the center.  I will still re-finish the walls and paint when I do the rest of the house but it is good for now.  I actually only have enough clothes to fill about 1/3 of it but it gives room for growth. This panorama photo gives you a good idea of the whole walk-in closet. 


I also want to point out my “craft project.”  You can see it in the above picture but here is a close-up picture.  


It is made of used golf balls glued together.  There is actually Styrofoam in the center so only the balls are on the outside.  The basket came from Lowes.  For a 45 minute project it turned out pretty good. 

I have also been working on the stone on the front of the house and finished the last column tonight.  It turned into quite the task but turned out great.  I used just under 240 pounds or mortar attaching the stone to the base of the column.  You can see an update of the front of the house below. 


My brother and I have been working on adding the railings which can also be seen in the photo.  The bottom rails are painted wood but the top cap is stained.  We stained it a mahogany color and then coated it with five coats of exterior polyurethane.  They turned out really good and look like they are part of a Chris Craft (that is a high end wood boat.) A close up picture is below. 


Other than the recent fight I had with an angle grinder that took out a large chunk of my thumb, (the grinder won) that is all for now.  This weekend I hope to install a bigger garage door, complete the railings, and maybe even build a greenhouse in the back yard.  Now that I have my life back, look for more frequent updates.  

Tuesday, August 13, 2013

Quick Column Update.....

A little progress has been made this week.  My brother and I finished up the moldings on the columns and the wood tops.  The wood tops are actually four individual pieces but once they are filled and painted they look just like they are one solid piece.  They turned out real well.  I only have one and a half columns left to complete but below you can see the progress.









  I also installed 26 rolls of sod in my back yard this weekend to fill in where there used to be an old paver patio.  I don’t have any pictures now but will take some later.  Lastly, the last of the closet organizer should arrive tomorrow and I will try to get that in this week.  I ordered it online from closetmaid.com so it only cost $150 shipped where as if I went to Lowes it would have been over $300.  It is amazing what you can find online for less if you are willing to wait a few days for shipping.  Well that is all for now.  Watch for a big update in the next couple weeks.  

Sunday, August 4, 2013

A Few Quick Updates...

Well it has been awhile since the last update but things are progressing well.  I have a feeling that there is a re-occurring theme with these blog posts of being way too busy with work to get as much completed as I wanted to; but it doesn't look like that will be changing anytime soon.  I have been continuing the work on the stone columns and now 3 of the 4.5 columns are completed.  I am going to try and get the rest completed after work this week.  My big move-out for student housing is only about 2 weeks away so I really only have two more weeks to get tasks completed at my house before I have to spend almost 7 days a week at my job and that lasts for almost a month. Anyone reading this that has worked in Student Housing is feeling my pain. 



 My brother also has been working on the moldings at the top of the columns.  They are not yet painted but you can see what a difference it is making.  The moldings are just pine and then covered with an outdoor spackle to fill in all the imperfections.  Once sanded and painted you cannot even tell that the wood had imperfections.  I am looking for stone caps to put on the top of the columns and then more moldings go on top of that.   



I have also been working on re-doing my master bedroom closet.  This first picture shows what the closet used to look like.  It was original to the house and nothing has been done to it since the 70’s but it is nice because it is walk-in.

 

I tore out one side of the closet and installed the main tower but I have the other side still to do. There is a little story on the closet system. I bought the system 4 years ago in Oklahoma and in Colorado at Lowes.  This product was getting phased out so I bought it on clearance.  I literally hauled half this closet with me from Oklahoma.  The main tower was originally $400 but I bought it for $120.  The doors for the closet I bought for $12 but were originally $70.  All the drawer and cabinet fronts are solid wood and most of the closet system is actually real wood veneer.  It is going to be really neat when it is done.



I then hung the bars and you can now see what it looks like.  The closet will get all new baseboards and I am debating on hanging crown molding, but I kind of think it would look neat and only cost about $50.  I will also be repainting when I paint the rest of the house.  I will post the rest of the pictures when I complete the project.  This is the first real project on the inside of the house but as it starts to get colder outside, more posts will be about inside renovations. 



Lastly, I have started a counter to keep track of all the trips to the hardware store.  Below you can see the tally so far.  I will try to update it each week.  Well that is all for now; have a great week!